Returning to Dominate The World With My Knowledge System

Chapter 98: Supercomputing Server in Progress



It took Tyler more than three full days to complete the adjustments to the fabrication equipment.

Each calibration was painstaking, detailed, and tested multiple times before being locked in.

There was no room for error—not when the goal was to produce the core of a supercomputing server that would eventually house Freya’s AGI-level mind.

Once the final parameter was set, and the green-light sequences had all passed Freya’s simulation checks, Tyler gave the go-ahead for production to begin.

He had already informed his team in advance. They arrived at the fabrication plant early the next morning, energized and ready get to work.

Since they has already worked with Tyler before on the Valkyrie-X GPU chips, the DRAMs, and the NVMe based DRAMs that was used to build Heimdall, they quickly understood what they needed to do after explained everything to them.

The latest_epɪ_sodes are on_the ɴovᴇl(ꜰ)ir(e).nᴇt

The task ahead of them was enormous.

Tyler needed a total of:

20,000 Valkyrie-X GPU chips

66,000 advanced DRAM modules

263,000 NVMe-based DRAM units

If you find any errors ( Ads popup, ads redirect, broken links, non-standard content, etc.. ), Please let us know < report chapter > so we can fix it as soon as possible.

Tip: You can use left, right, A and D keyboard keys to browse between chapters.